The worst-case performance ratio with time-dependent single-scheduling problems
From MaRDI portal
Recommendations
- Single machine scheduling problems with position-dependent processing times
- Single-machine scheduling problems with time and position dependent processing times
- Study on single machine scheduling problem based on general time-and-position dependent jobs processing time
- Scheduling jobs with position-dependent processing times
- Single-machine total completion time scheduling with a time-dependent deterioration
Cited in
(7)- A Worst-case Performance of the Shortest-processing-time Heuristic for Single Machine Scheduling
- On the worst-case ratio of a compound multiprocessor scheduling algorithm
- Study on single machine scheduling problem based on general time-and-position dependent jobs processing time
- Worst Case Bound of an LRF Schedule for the Mean Weighted Flow-Time Problem
- Single machine scheduling problems with position-dependent processing times
- Worst-case analysis of the WSPT and MWSPT rules for single machine scheduling with one planned setup period
- Average and worst-case analysis of heuristics for the maximum tardiness problem
This page was built for publication: The worst-case performance ratio with time-dependent single-scheduling problems
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q5167620)