Throughput optimization in two-machine flowshops with flexible operations
From MaRDI portal
Recommendations
- Two-machine flowshop scheduling with flexible operations and controllable processing times
- scientific article; zbMATH DE number 4130175
- Batch scheduling in a two-stage flexible flow shop problem
- Flow Management in Flexible Manufacturing Cells with Pipeline Operations
- Scheduling alternative operations in two-machine flow-shops
Cites work
- scientific article; zbMATH DE number 5345854 (Why is no real title available?)
- A Production Line that Balances Itself
- A classification of assembly line balancing problems
- A framework for the complexity of high-multiplicity scheduling problems
- A survey on problems and methods in generalized assembly line balancing
- A tabu-search heuristic for the flexible-resource flow shop scheduling problem
- Cyclic scheduling of a 2-machine robotic cell with tooling constraints
- Design and operation of dynamic assembly lines using work-sharing
- Dynamic task assignment for throughput maximization with worksharing
- Flow Shop Scheduling with Resource Flexibility
- Flow shop scheduling with partial resource flexibility
- Formulation and Solution of Nonlinear Integer Production Planning Problems for Flexible Manufacturing Systems
- Multiplicity and complexity issues in contemporary production scheduling
- Optimal two- and three-stage production schedules with set-up time included
- Production planning problems in printed circuit board assembly
- Scheduling three-operation jobs in a two-machine flow shop to minimize makespan
- Self-Buffering, Self-Balancing, Self-Flushing Production Lines
- Sequencing a One State-Variable Machine: A Solvable Case of the Traveling Salesman Problem
- State-of-the-art exact and heuristic solution procedures for simple assembly line balancing
Cited in
(10)- Exact solution of the two-machine flow shop problem with three operations
- Shop scheduling problems with pliable jobs
- Optimal lot streaming for multiple products in a two-machine flow shop
- Two-machine flow shop scheduling problem with blocking, multi-task flexibility of the first machine, and preemption
- Two-stage proportionate flexible flow shop to minimize the makespan
- Flow Management in Flexible Manufacturing Cells with Pipeline Operations
- No-wait two-stage flowshop problem with multi-task flexibility of the first machine
- Two-machine flowshop scheduling with three-operation jobs subject to a fixed job sequence
- Maximizing total early work in a distributed two‐machine flow‐shop
- Configuring flexible flowlines
This page was built for publication: Throughput optimization in two-machine flowshops with flexible operations
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q983633)