Two-level GA-based method of fuzzy planning and scheduling
From MaRDI portal
Recommendations
- Optimization for fuzzy flexible job shop scheduling based on genetic algorithm
- Genetic multi-criteria approach to flexible line scheduling
- scientific article; zbMATH DE number 1488922
- GA, SA and RB/KB-based hybrid method in FMS scheduling
- USING GENETIC ALGORITHMS TO SOLVE FUZZY FLOW SHOP SCHEDULING PROBLEMS BASED ON POSSIBILITY AND NECESSITY MEASURES
Cited in
(2)
This page was built for publication: Two-level GA-based method of fuzzy planning and scheduling
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2704887)