Two-machine flow shop problems with a single server
From MaRDI portal
Recommendations
- Scheduling a single server in a two-machine flow shop
- The two-machine flowshop no-wait scheduling problem with a single server to minimize the total completion time
- Heuristics for the two-machine scheduling problem with a single server
- Complexity results for flow-shop problems with a single server
- Scheduling for parallel dedicated machines with a single server
Cites work
- A new heuristic method for the flow shop sequencing problem
- A tabu search approach for the flow shop scheduling problem
- Complexity results for flow-shop problems with a single server
- scientific article; zbMATH DE number 4048925 (Why is no real title available?)
- scientific article; zbMATH DE number 3497315 (Why is no real title available?)
- scientific article; zbMATH DE number 2050708 (Why is no real title available?)
- scientific article; zbMATH DE number 194544 (Why is no real title available?)
- Minimizing makespan for flow shop scheduling by combining simulated annealing with sequencing knowledge
- Modified simulated annealing algorithms for the flow shop sequencing problem
- One-operator-two-machine flowshop scheduling with setup and dismounting times
- Optimal two- and three-stage production schedules with set-up time included
- Parallel Taboo Search Techniques for the Job Shop Scheduling Problem
- Scheduling for parallel dedicated machines with a single server
- Scheduling parallel machines with a single server: Some solvable cases and heuristics
- Some efficient heuristic methods for the flow shop sequencing problem
- Tabu Search—Part I
- Tabu Search—Part II
- The application of the simulated annealing algorithm to the solution of the \(n/m/C_{\max}\) flowshop problem
- The Complexity of Flowshop and Jobshop Scheduling
- The two-machine sequence dependent flowshop scheduling problem
- Two-Stage, Hybrid Flowshop Scheduling Problem
Cited in
(9)- Complexity results for flow-shop problems with a single server
- The two-machine flowshop no-wait scheduling problem with a single server to minimize the total completion time
- Dual processes to solve single server systems
- Two-machine open shop problem with a single server and set-up time considerations
- Heuristics for the two-machine scheduling problem with a single server
- scientific article; zbMATH DE number 1839523 (Why is no real title available?)
- Two-machine job shop problem with a single server and sequence-independent non-anticipatory set-up times
- Robotic flow shop scheduling problem with combined buffer conditions
- Parallel machine scheduling with multiple unloading servers
This page was built for publication: Two-machine flow shop problems with a single server