Two-machine group scheduling problem with blocking and anticipatory setups
From MaRDI portal
Recommendations
- A heuristic for scheduling two-machine no-wait flow shops with anticipatory setups
- Two-machine flowshop batching and scheduling
- Group technology approach to the open shop scheduling problem with batch setup times
- The complexity of two group scheduling problems
- Two-machine flowshop group scheduling problem
Cites work
- A graph partitioning procedure for machine assignment and cell formation in group technology†
- A Heuristic Algorithm for the n Job, m Machine Sequencing Problem
- A method for finding minimal bottle-neck cells for grouping part-machine families†
- A Survey of Machine Scheduling Problems with Blocking and No-Wait in Process
- Flowshop scheduling with limited temporary storage
- Grouping of parts and components in flexible manufacturing systems
- scientific article; zbMATH DE number 3639144 (Why is no real title available?)
- Integrated design of cellular manufacturing systems in the presence of alternative process plans
- On non-permutation solutions to some two machine flow shop scheduling problems
- Optimal two- and three-stage production schedules with set-up time included
- Sequencing a One State-Variable Machine: A Solvable Case of the Traveling Salesman Problem
- Sequencing n jobs on two machines with setup, processing and removal times separated
- The Complexity of Flowshop and Jobshop Scheduling
- ZODIAC—an algorithm for concurrent formation of part-families and machine-cells
Cited in
(15)- Efficient solutions to the cell-formation problem with multiple routings via a double-loop genetic algorithm
- Total flowtime in no-wait flowshops with separated setup times.
- Batch scheduling in a two-machine flow shop with limited buffer and sequence independent setup times and removal times.
- A heuristic for scheduling two-machine no-wait flow shops with anticipatory setups
- A comprehensive review of flowshop group scheduling literature
- A hybrid metaheuristic approach for minimizing the total flow time in a flow shop sequence dependent group scheduling problem
- Mixed integer linear programming models for flow shop scheduling with a demand plan of job types
- A heuristic approach for two-machine no-wait flowshop scheduling with due dates and class setups
- Group scheduling on two cells with intercell movement
- Two-machine group scheduling problems in discrete parts manufacturing with sequence-dependent setups
- A review of TSP based approaches for flowshop scheduling
- Flowshop-scheduling problems with makespan criterion: a review
- A new heuristic and dominance relations for no-wait flowshops with setups
- A multi-objective memetic algorithm for energy-efficient flow shop group scheduling problem with a dynamic speed-scaling mechanism
- A bicriteria flowshop scheduling problem with setup times
This page was built for publication: Two-machine group scheduling problem with blocking and anticipatory setups
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1309970)