Two-machine routing open shop: How long is the optimal makespan?
From MaRDI portal
Recommendations
- The 2-Machine Routing Open Shop on a Triangular Transportation Network
- A 6 5-approximation algorithm for the two-machine routing open-shop problem on a two-node network
- Routing open shop with two nodes, unit processing times and equal number of jobs and machines
- On a routing open shop problem on two nodes with unit processing times
- On the optima localization for the three-machine routing open shop
Cites work
- scientific article; zbMATH DE number 3746840 (Why is no real title available?)
- scientific article; zbMATH DE number 3503127 (Why is no real title available?)
- scientific article; zbMATH DE number 1305102 (Why is no real title available?)
- A 6 5-approximation algorithm for the two-machine routing open-shop problem on a two-node network
- A historical note on the 3/2-approximation algorithm for the metric traveling salesman problem
- Efficient algorithms for the routing open shop with unrelated travel times on cacti
- Efficient approximation algorithms for the routing open shop problem
- On some properties of optimal schedules in the job shop problem with preemption and an arbitrary regular criterion
- On the optima localization for the three-machine routing open shop
- Open Shop Scheduling to Minimize Finish Time
- Optimal two- and three-stage production schedules with set-up time included
- The 2-Machine Routing Open Shop on a Triangular Transportation Network
- The routing open-shop problem on a network: complexity and approximation
- Two-machine routing open shop on a tree: instance reduction and efficiently solvable subclass
Cited in
(4)- Approximation algorithms for two-machine proportionate routing open shop on a tree
- On the optima localization for the three-machine routing open shop
- Irreducible bin packing and normality in routing open shop
- Exponential tightness for integral-type functionals of centered independent differently distributed random variables
This page was built for publication: Two-machine routing open shop: How long is the optimal makespan?
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2117636)