Pages that link to "Item:Q2519079"
From MaRDI portal
The following pages link to A new discrete particle swarm optimization approach for the single-machine total weighted tardiness scheduling problem with sequence-dependent setup times (Q2519079):
Displayed 21 items.
- The third comprehensive survey on scheduling problems with setup times/costs (Q319774) (← links)
- A study of hybrid evolutionary algorithms for single machine scheduling problem with sequence-dependent setup times (Q337074) (← links)
- An exact algorithm for the single-machine total weighted tardiness problem with sequence-dependent setup times (Q339586) (← links)
- Binary accelerated particle swarm algorithm (BAPSA) for discrete optimization problems (Q377748) (← links)
- Iterated local search for single-machine scheduling with sequence-dependent setup times to minimize total weighted tardiness (Q398925) (← links)
- Metaheuristics for the multi-objective FJSP with sequence-dependent set-up times, auxiliary resources and machine down time (Q613775) (← links)
- A hybrid particle swarm optimization approach for the sequential ordering problem (Q622165) (← links)
- A discrete differential evolution algorithm for the single machine total weighted tardiness problem with sequence dependent setup times (Q1000975) (← links)
- Efficient local search limitation strategy for single machine total weighted tardiness scheduling with sequence-dependent setup times (Q1652166) (← links)
- A variable neighborhood search for minimizing total weighted tardiness with sequence dependent setup times on a single machine (Q1762139) (← links)
- Hybrid differential evolution optimisation for Earth observation satellite scheduling with time-dependent earliness-tardiness penalties (Q1992511) (← links)
- A hybrid metaheuristic for the prize-collecting single machine scheduling problem with sequence-dependent setup times (Q2270448) (← links)
- Minimizing maximum tardiness and delivery costs with batch delivery and job release times (Q2282368) (← links)
- Prepositioning emergency earthquake response supplies: a new multi-objective particle swarm optimization algorithm (Q2290865) (← links)
- Probability mechanism based particle swarm optimization algorithm and its application in resource-constrained project scheduling problems (Q2296600) (← links)
- A unified heuristic and an annotated bibliography for a large class of earliness-tardiness scheduling problems (Q2327956) (← links)
- An improved particle swarm optimization algorithm to solve hybrid flowshop scheduling problems with the effect of human factors -- a case study (Q2337384) (← links)
- Scatter search for minimizing weighted tardiness in a single machine scheduling with setups (Q2403268) (← links)
- A new encoding scheme-based hybrid algorithm for minimising two-machine flow-shop group scheduling problem (Q5172421) (← links)
- An iterated greedy algorithm for the single-machine total weighted tardiness problem with sequence-dependent setup times (Q5172564) (← links)
- Heuristic solution approaches for the cumulative capacitated vehicle routing problem (Q5746676) (← links)