Pages that link to "Item:Q2519079"
From MaRDI portal
The following pages link to A new discrete particle swarm optimization approach for the single-machine total weighted tardiness scheduling problem with sequence-dependent setup times (Q2519079):
Displayed 4 items.
- Metaheuristics for the multi-objective FJSP with sequence-dependent set-up times, auxiliary resources and machine down time (Q613775) (← links)
- A hybrid particle swarm optimization approach for the sequential ordering problem (Q622165) (← links)
- A discrete differential evolution algorithm for the single machine total weighted tardiness problem with sequence dependent setup times (Q1000975) (← links)
- A hybrid metaheuristic for the prize-collecting single machine scheduling problem with sequence-dependent setup times (Q2270448) (← links)