Pages that link to "Item:Q3182654"
From MaRDI portal
The following pages link to Scheduling preventive railway maintenance activities (Q3182654):
Displaying 13 items.
- Maximising the weighted number of activity execution modes in project planning (Q724006) (← links)
- Scheduling of maintenance work of a large-scale tramway network (Q724038) (← links)
- A two-stage coupled algorithm for an integrated maintenance planning and flowshop scheduling problem with deteriorating machines (Q892903) (← links)
- A combined column generation and heuristics for railway short-term rolling stock planning with regular inspection constraints (Q1652213) (← links)
- Timetable rearrangement to cope with railway maintenance activities (Q1652638) (← links)
- Shunting operations at flat yards: retrieving freight railcars from storage tracks (Q1656426) (← links)
- Scheduling preventive railway maintenance activities with resource constraints (Q1687684) (← links)
- Optimizing large scale upgradations involving movable assets (Q2085498) (← links)
- Scheduling of maintenance windows in a mining supply chain rail network (Q2289897) (← links)
- The stochastic opportunistic replacement problem. II: A two-stage solution approach (Q2341273) (← links)
- Operation and preventive maintenance scheduling for containerships: mathematical model and solution algorithm (Q2355894) (← links)
- Workforce routing and scheduling for electricity network maintenance with downtime minimization (Q2356225) (← links)
- Multi-objective model for optimizing railway infrastructure asset renewal (Q5059239) (← links)