Pages that link to "Item:Q3182654"
From MaRDI portal
The following pages link to Scheduling preventive railway maintenance activities (Q3182654):
Displaying 7 items.
- Maximising the weighted number of activity execution modes in project planning (Q724006) (← links)
- Scheduling of maintenance work of a large-scale tramway network (Q724038) (← links)
- A two-stage coupled algorithm for an integrated maintenance planning and flowshop scheduling problem with deteriorating machines (Q892903) (← links)
- A combined column generation and heuristics for railway short-term rolling stock planning with regular inspection constraints (Q1652213) (← links)
- Timetable rearrangement to cope with railway maintenance activities (Q1652638) (← links)
- Shunting operations at flat yards: retrieving freight railcars from storage tracks (Q1656426) (← links)
- Scheduling preventive railway maintenance activities with resource constraints (Q1687684) (← links)