The following pages link to Safia Kedad-Sidhoum (Q320790):
Displaying 29 items.
- The single-item green lot-sizing problem with fixed carbon emissions (Q320793) (← links)
- Valid inequalities for the synchronization bus timetabling problem (Q322699) (← links)
- Machine reassignment problem: the ROADEF/EURO challenge 2012 (Q338848) (← links)
- Performance guarantees for a scheduling problem with common stepwise job payoffs (Q476886) (← links)
- A study of scheduling problems with preemptions on multi-core computers with GPU accelerators (Q499342) (← links)
- Batch sizing and just-in-time scheduling with common due date (Q744646) (← links)
- Models and Lagrangian heuristics for a two-level lot-sizing problem with bounded inventory (Q747754) (← links)
- Mixed integer formulations using natural variables for single machine scheduling around a common due date (Q827597) (← links)
- A faster branch-and-bound algorithm for the earliness-tardiness scheduling problem (Q835579) (← links)
- The multi-item capacitated lot-sizing problem with safety stocks and demand shortage costs (Q1025236) (← links)
- The unit-capacity constrained permutation problem (Q1754340) (← links)
- Two-level lot-sizing with inventory bounds (Q1756341) (← links)
- Coordination of a two-level supply chain with contracts (Q2044552) (← links)
- Reinforcement learning for variable selection in a branch and bound algorithm (Q2110404) (← links)
- Motivations and analysis of the capacitated lot-sizing problem with setup times and minimum and maximum ending inventories (Q2140332) (← links)
- Dominance inequalities for scheduling around an unrestrictive common due date (Q2242293) (← links)
- Lot sizing with carbon emission constraints (Q2253622) (← links)
- Single-machine common due date total earliness/tardiness scheduling with machine unavailability (Q2286433) (← links)
- A multi-stage stochastic integer programming approach for a multi-echelon lot-sizing problem with returns and lost sales (Q2289944) (← links)
- Fast neighborhood search for the single machine earliness-tardiness scheduling problem (Q2379655) (← links)
- Integrated batch sizing and scheduling on a single machine (Q2434256) (← links)
- Single machine scheduling with delivery dates and cumulative payoffs (Q2434318) (← links)
- The multi-item capacitated lot-sizing problem with setup times and shortage costs (Q2464221) (← links)
- The one-machine problem with earliness and tardiness penalties (Q2464404) (← links)
- Lower bounds for the earliness-tardiness scheduling problem on parallel machines with distinct due dates (Q2482802) (← links)
- Just-in-Time Planning and Lot-Sizing (Q2958674) (← links)
- Uncapacitated lot-sizing problem with production time windows, early productions, backlogs and lost sales (Q2997889) (← links)
- Combining Polyhedral Approaches and Stochastic Dual Dynamic Integer Programming for Solving the Uncapacitated Lot-Sizing Problem Under Uncertainty (Q5086004) (← links)
- Lagrangean Heuristic for a Multi-Plant Lot-Sizing Problem with Transfer and Storage Capacities (Q5397710) (← links)