The following pages link to Safia Kedad-Sidhoum (Q320790):
Displaying 11 items.
- The single-item green lot-sizing problem with fixed carbon emissions (Q320793) (← links)
- Valid inequalities for the synchronization bus timetabling problem (Q322699) (← links)
- Machine reassignment problem: the ROADEF/EURO challenge 2012 (Q338848) (← links)
- Performance guarantees for a scheduling problem with common stepwise job payoffs (Q476886) (← links)
- A study of scheduling problems with preemptions on multi-core computers with GPU accelerators (Q499342) (← links)
- Batch sizing and just-in-time scheduling with common due date (Q744646) (← links)
- Models and Lagrangian heuristics for a two-level lot-sizing problem with bounded inventory (Q747754) (← links)
- Mixed integer formulations using natural variables for single machine scheduling around a common due date (Q827597) (← links)
- A faster branch-and-bound algorithm for the earliness-tardiness scheduling problem (Q835579) (← links)
- Combining Polyhedral Approaches and Stochastic Dual Dynamic Integer Programming for Solving the Uncapacitated Lot-Sizing Problem Under Uncertainty (Q5086004) (← links)
- Lagrangean Heuristic for a Multi-Plant Lot-Sizing Problem with Transfer and Storage Capacities (Q5397710) (← links)