The following pages link to Scheduling (Q5900021):
Displaying 50 items.
- Synchronous cellular automata-based scheduler initialized by heuristic and modeled by a pseudo-linear neighborhood (Q272772) (← links)
- Machine scheduling in underground mining: an application in the potash industry (Q280169) (← links)
- New effective MILP models for PFSPs arising from real applications (Q301126) (← links)
- Cost-sharing scheduling games on restricted unrelated machines (Q306273) (← links)
- Controlled semi-Markov chains with risk-sensitive average cost criterion (Q306415) (← links)
- Configuration and the advantages of the shifting bottleneck procedure for optimizing the job shop total weighted tardiness scheduling problem (Q309064) (← links)
- Exact algorithms for single-machine scheduling with time windows and precedence constraints (Q310349) (← links)
- Resource loading with time windows (Q319369) (← links)
- Solving the traveling repairman problem on a line with general processing times and deadlines (Q319440) (← links)
- Practical solutions for a dock assignment problem with trailer transportation (Q319870) (← links)
- List scheduling and beam search methods for the flexible job shop scheduling problem with sequencing flexibility (Q320008) (← links)
- A set-partitioning-based model for the berth allocation problem under time-dependent limitations (Q322604) (← links)
- Dynamic resource allocation to improve emergency department efficiency in real time (Q323566) (← links)
- Scheduling arc shut downs in a network to maximize flow over time with a bounded number of jobs per time period (Q326488) (← links)
- Periodicity of real-time schedules for dependent periodic tasks on identical multiprocessor platforms (Q332516) (← links)
- Scheduling unrelated parallel batch processing machines with non-identical job sizes (Q336679) (← links)
- Branch and bound algorithms for the bus evacuation problem (Q336688) (← links)
- Minimizing the weighted sum of maximum earliness and maximum tardiness costs on a single machine with periodic preventive maintenance (Q337029) (← links)
- Decomposition based hybrid VNS-TS algorithm for distributed parallel factories scheduling with virtual corporation (Q337206) (← links)
- Multi-mode resource-constrained project scheduling problems with non-preemptive activity splitting (Q337299) (← links)
- Genetic tabu search for the fuzzy flexible job shop problem (Q337343) (← links)
- Variability of completion time differences in permutation flow shop scheduling (Q337356) (← links)
- A comprehensive review and evaluation of permutation flowshop heuristics to minimize flowtime (Q339553) (← links)
- A single machine carryover sequence-dependent group scheduling in PCB manufacturing (Q339574) (← links)
- Finding optimal tour schedules on transportation paths under extended time window constraints (Q341462) (← links)
- A hybrid Lagrangian-simulated annealing-based heuristic for the parallel-machine capacitated lot-sizing and scheduling problem with sequence-dependent setup times (Q342038) (← links)
- Heuristic approaches for scheduling jobs in large-scale flexible job shops (Q342300) (← links)
- Scheduling two parallel machines with machine-dependent availabilities (Q342363) (← links)
- New simple constructive heuristic algorithms for minimizing total flow-time in the permutation flowshop scheduling problem (Q342481) (← links)
- A multi-shift vehicle routing problem with windows and cycle times (Q360503) (← links)
- Depth-first heuristic search for the job shop scheduling problem (Q363574) (← links)
- Formulating and solving a multi-mode resource-collaboration and constrained scheduling problem (MRCCSP) (Q363579) (← links)
- An iterative approach for the serial batching problem with parallel machines and job families (Q363588) (← links)
- Optimal size-based opportunistic scheduler for wireless systems (Q383283) (← links)
- Approximation algorithms for two-machine open shop scheduling with batch and delivery coordination (Q387811) (← links)
- On an extension of the Sort \& Search method with application to scheduling theory (Q392015) (← links)
- A survey on offline scheduling with rejection (Q398830) (← links)
- Exact algorithms for inventory constrained scheduling on a single machine (Q398845) (← links)
- Minimizing sequence-dependent setup costs in feeding batch processes under due date restrictions (Q398878) (← links)
- A cutting and scheduling problem in float glass manufacturing (Q398905) (← links)
- Scheduling arc maintenance jobs in a network to maximize total flow over time (Q406493) (← links)
- A PMBGA to optimize the selection of rules for job shop scheduling based on the Giffler-Thompson algorithm (Q411034) (← links)
- Discrete and continuous time representations and mathematical models for large production scheduling problems: a case study from the pharmaceutical industry (Q421674) (← links)
- Optimizing performance and reliability on heterogeneous parallel systems: approximation algorithms and heuristics (Q433416) (← links)
- Flowshop scheduling problems with a position-dependent exponential learning effect (Q474618) (← links)
- Balancing and scheduling of flexible mixed model assembly lines (Q481715) (← links)
- Solution algorithms for unrelated machines minmax regret scheduling problem with interval processing times and the total flow time criterion (Q490241) (← links)
- Algorithms for scheduling with integer preemptions on parallel machines to minimize the maximum lateness (Q499334) (← links)
- Models and optimization problems for single-processor servicing of packets of objects (Q510292) (← links)
- Minimizing value-at-risk in single-machine scheduling (Q513548) (← links)