Pages that link to "Item:Q863984"
From MaRDI portal
The following pages link to A multi-objective production scheduling case study solved by simulated annealing (Q863984):
Displayed 14 items.
- Optimizing of bullwhip effect and net stock amplification in three-echelon supply chains using evolutionary multi-objective metaheuristics (Q324324) (← links)
- Clustering and selecting suppliers based on simulated annealing algorithms (Q418322) (← links)
- Decentralized operation strategies for an integrated building energy system using a memetic algorithm (Q439352) (← links)
- Minimizing the number of tardy jobs in the flowshop problem with operation and resource flexibility (Q732893) (← links)
- A hybrid approach for supplier cluster analysis (Q980266) (← links)
- Mathematical models for job-shop scheduling problems with routing and process plan flexibility (Q988383) (← links)
- Cultural-based genetic tabu algorithm for multiobjective job shop scheduling (Q1717896) (← links)
- Location of facility based on simulated annealing and ``ZKW'' algorithms (Q1992773) (← links)
- Multiobjective optimization for complex flexible job-shop scheduling problems (Q2239940) (← links)
- Mixed integer goal programming models for the flexible job-shop scheduling problems with separable and non-separable sequence dependent setup times (Q2428941) (← links)
- Optimization of the integrated problem of employee timetabling and job shop scheduling (Q2669607) (← links)
- A research survey: review of flexible job shop scheduling techniques (Q2811943) (← links)
- A genetic algorithm for flexible job shop scheduling with fuzzy processing time (Q3163319) (← links)
- Multi-Objective Optimization and Multi-Attribute Decision Making for a Novel Batch Scheduling Problem Based on Mould Capabilities (Q5270518) (← links)