Scheduling of job-block with dead line in n\(\times 2\) flowshop problem with separated set up times (Q1060679): Difference between revisions

From MaRDI portal
Importer (talk | contribs)
Created a new Item
 
Import240304020342 (talk | contribs)
Set profile property.
 
(3 intermediate revisions by 2 users not shown)
Property / reviewed by
 
Property / reviewed by: Jacek Błażewicz / rank
Normal rank
 
Property / reviewed by
 
Property / reviewed by: Jacek Błażewicz / rank
 
Normal rank
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
links / mardi / namelinks / mardi / name
 

Latest revision as of 02:04, 5 March 2024

scientific article
Language Label Description Also known as
English
Scheduling of job-block with dead line in n\(\times 2\) flowshop problem with separated set up times
scientific article

    Statements

    Scheduling of job-block with dead line in n\(\times 2\) flowshop problem with separated set up times (English)
    0 references
    0 references
    0 references
    1985
    0 references
    The problem to be considered is one of scheduling n jobs in a two-machine flow shop. Jobs are characterized by processing times and set-up times. Moreover, some subsets of jobs are to be processed in a no-wait mode before specified deadlines. The objective is to find a schedule of minimum length. In the paper an optimization algorithm is proposed, its complexity, however, is not evaluated.
    0 references
    deadline scheduling
    0 references
    two-machine flow shop
    0 references
    processing times
    0 references
    set-up times
    0 references
    schedule of minimum length
    0 references
    algorithm
    0 references

    Identifiers