Optimum workforce scheduling under the (14, 21) days-off timetable (Q1428291): Difference between revisions

From MaRDI portal
Added link to MaRDI item.
Import240304020342 (talk | contribs)
Set profile property.
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank

Revision as of 04:18, 5 March 2024

scientific article
Language Label Description Also known as
English
Optimum workforce scheduling under the (14, 21) days-off timetable
scientific article

    Statements

    Optimum workforce scheduling under the (14, 21) days-off timetable (English)
    0 references
    0 references
    25 March 2004
    0 references
    Summary: An efficient optimum solution is presented for a real-life employee days-off scheduling problem with a three-week cycle. Over a given work cycle, each worker is given 14 successive workdays and 7 successive off days. This three-week days-off timetable is referred to as the (14, 21) schedule. Given different labor demands for each day of the week, the primary objective is to minimize the number of workers. The secondary objective is to reduce transportation cost by minimizing the number of active days-off patterns. The solution technique utilizes the dual LP solution to determine the minimum number of workers and feasible days-off assignments, without using linear or integer programming. The simple solution technique eliminates the need to use integer programming for this particular scheduling problem.
    0 references
    0 references