Solving an EPQ model with rework and service level constraint (Q2455815): Difference between revisions

From MaRDI portal
Added link to MaRDI item.
Set OpenAlex properties.
 
(One intermediate revision by one other user not shown)
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.3390/mca11010075 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2377754652 / rank
 
Normal rank

Latest revision as of 18:04, 19 March 2024

scientific article
Language Label Description Also known as
English
Solving an EPQ model with rework and service level constraint
scientific article

    Statements

    Solving an EPQ model with rework and service level constraint (English)
    0 references
    0 references
    0 references
    0 references
    26 October 2007
    0 references
    Summary: This paper examines an economic production quantity (EPQ) model with rework and service level constraint. First, we prove that the expected overall costs for an imperfect EPQ model with backlogging permitted is less than or equal to that of the one without backlogging. Secondly, the relationship between ``imputed backorder cost'' and maximal shortage level is derived for decision-making on whether the required service level is achievable. Then an equation for calculating the intangible backorder cost is proposed for situation when the required service level is not attainable. By including this intangible backorder cost in mathematical analysis, one can derive a new optimal lot-size policy that minimizes expected total costs as well as satisfies the maximal shortage level constraint for the EPQ model with rework. Numerical example is provided to demonstrate its practical usage.
    0 references
    manufacturing
    0 references
    economic production quantity
    0 references

    Identifiers