Solving an EPQ model with rework and service level constraint (Q2455815): Difference between revisions
From MaRDI portal
Added link to MaRDI item. |
Set OpenAlex properties. |
||
(One intermediate revision by one other user not shown) | |||
Property / MaRDI profile type | |||
Property / MaRDI profile type: MaRDI publication profile / rank | |||
Normal rank | |||
Property / full work available at URL | |||
Property / full work available at URL: https://doi.org/10.3390/mca11010075 / rank | |||
Normal rank | |||
Property / OpenAlex ID | |||
Property / OpenAlex ID: W2377754652 / rank | |||
Normal rank |
Latest revision as of 18:04, 19 March 2024
scientific article
Language | Label | Description | Also known as |
---|---|---|---|
English | Solving an EPQ model with rework and service level constraint |
scientific article |
Statements
Solving an EPQ model with rework and service level constraint (English)
0 references
26 October 2007
0 references
Summary: This paper examines an economic production quantity (EPQ) model with rework and service level constraint. First, we prove that the expected overall costs for an imperfect EPQ model with backlogging permitted is less than or equal to that of the one without backlogging. Secondly, the relationship between ``imputed backorder cost'' and maximal shortage level is derived for decision-making on whether the required service level is achievable. Then an equation for calculating the intangible backorder cost is proposed for situation when the required service level is not attainable. By including this intangible backorder cost in mathematical analysis, one can derive a new optimal lot-size policy that minimizes expected total costs as well as satisfies the maximal shortage level constraint for the EPQ model with rework. Numerical example is provided to demonstrate its practical usage.
0 references
manufacturing
0 references
economic production quantity
0 references