Preemptive Scheduling of Equal Length Jobs on Two Machines to Minimize Mean Flow Time (Q3202129): Difference between revisions
From MaRDI portal
Added link to MaRDI item. |
Set OpenAlex properties. |
||
(One intermediate revision by one other user not shown) | |||
Property / MaRDI profile type | |||
Property / MaRDI profile type: MaRDI publication profile / rank | |||
Normal rank | |||
Property / full work available at URL | |||
Property / full work available at URL: https://doi.org/10.1287/opre.38.3.487 / rank | |||
Normal rank | |||
Property / OpenAlex ID | |||
Property / OpenAlex ID: W2153657089 / rank | |||
Normal rank |
Latest revision as of 20:00, 19 March 2024
scientific article
Language | Label | Description | Also known as |
---|---|---|---|
English | Preemptive Scheduling of Equal Length Jobs on Two Machines to Minimize Mean Flow Time |
scientific article |
Statements
Preemptive Scheduling of Equal Length Jobs on Two Machines to Minimize Mean Flow Time (English)
0 references
1990
0 references
equal-length jobs
0 references
release times
0 references
identical, parallel machines
0 references
mean flow time
0 references
nonpreemptive and preemptive scheduling
0 references