Preemptive Scheduling of Equal Length Jobs on Two Machines to Minimize Mean Flow Time

From MaRDI portal
Publication:3202129

DOI10.1287/OPRE.38.3.487zbMATH Open0715.90064OpenAlexW2153657089MaRDI QIDQ3202129FDOQ3202129


Authors: Lee A. Herrbach, Joseph Y.-T. Leung Edit this on Wikidata


Publication date: 1990

Published in: Operations Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1287/opre.38.3.487




Recommendations





Cited In (15)





This page was built for publication: Preemptive Scheduling of Equal Length Jobs on Two Machines to Minimize Mean Flow Time

Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3202129)