Modelling Set-up Times Overlapping Two Periods in the Proportional Lot-Sizing Problem with Identical Parallel Machines (Q2825621): Difference between revisions

From MaRDI portal
Importer (talk | contribs)
Created a new Item
 
Set OpenAlex properties.
 
(2 intermediate revisions by 2 users not shown)
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.7494/dmms.2013.7.1.43 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2117558077 / rank
 
Normal rank
links / mardi / namelinks / mardi / name
 

Latest revision as of 01:09, 20 March 2024

scientific article
Language Label Description Also known as
English
Modelling Set-up Times Overlapping Two Periods in the Proportional Lot-Sizing Problem with Identical Parallel Machines
scientific article

    Statements

    Modelling Set-up Times Overlapping Two Periods in the Proportional Lot-Sizing Problem with Identical Parallel Machines (English)
    0 references
    13 October 2016
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    production planning
    0 references
    lot-sizing and scheduling
    0 references
    mixed integer programming
    0 references
    0 references