Minimizing mean completion time in a batch processing system (Q1879250): Difference between revisions

From MaRDI portal
Importer (talk | contribs)
Created a new Item
 
Set OpenAlex properties.
(4 intermediate revisions by 3 users not shown)
Property / author
 
Property / author: Yu-Zhong Zhang / rank
Normal rank
 
Property / author
 
Property / author: Yu-Zhong Zhang / rank
 
Normal rank
Property / MaRDI profile type
 
Property / MaRDI profile type: Publication / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1007/s00453-003-1053-2 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W1972778917 / rank
 
Normal rank
links / mardi / namelinks / mardi / name
 

Revision as of 01:51, 20 March 2024

scientific article
Language Label Description Also known as
English
Minimizing mean completion time in a batch processing system
scientific article

    Statements

    Minimizing mean completion time in a batch processing system (English)
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    22 September 2004
    0 references
    We consider batch processing jobs to minimize the mean completion time. A batch processing machine can handle up to \(B\) jobs simultaneously. Each job is represented by an arrival time and a processing time. Jobs processed in a batch have the same completion time, i.e., their common starting time plus the processing time of their longest job. For batch processing, non-preemptive scheduling is usually required and we discuss this case. The batch processing problem reduces to the ordinary uniprocessor system scheduling problem if \(B=1\). We focus on the other extreme case \(B=+\infty\). Even for this seemingly simple extreme case, we are able to show that the problem is NP-hard for the weighted version. In addition, we establish a polynomial time algorithm for a special case when there are only a constant number of job processing times. Finally, we give a polynomial time approximation scheme for the general case.
    0 references

    Identifiers

    0 references
    0 references
    0 references
    0 references
    0 references
    0 references