Setup cost stability region for the dynamic lot sizing problem with backlogging (Q1197651): Difference between revisions

From MaRDI portal
RedirectionBot (talk | contribs)
Changed an Item
ReferenceBot (talk | contribs)
Changed an Item
 
(2 intermediate revisions by 2 users not shown)
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/0377-2217(92)90236-3 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2013663868 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Planning Horizons for the Dynamic Lot Size Model with Backlogging / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Dynamic Lot Sizing Model with Learning in Setups / rank
 
Normal rank
Property / cites work
 
Property / cites work: Note—An Improved Algorithm for the Stationary Cost Dynamic Lot Size Model with Backlogging / rank
 
Normal rank
Property / cites work
 
Property / cites work: Stability of the constant cost dynamic lot size model / rank
 
Normal rank
Property / cites work
 
Property / cites work: On the stability region for multi-level inventory problems / rank
 
Normal rank

Latest revision as of 14:28, 16 May 2024

scientific article
Language Label Description Also known as
English
Setup cost stability region for the dynamic lot sizing problem with backlogging
scientific article

    Statements

    Setup cost stability region for the dynamic lot sizing problem with backlogging (English)
    0 references
    0 references
    0 references
    16 January 1993
    0 references
    This paper develops a procedure to find the `setup cost stability regions' for the dynamic lot sizing problem with backlogging. The setup cost stability region for a solu\-tion is defined as the set of all setup cost values for which the given solution is optimal. Such results can be useful in studying the robustness of a given solution with respect to errors in cost estimates.
    0 references
    0 references

    Identifiers