MRP systems under supply and process uncertainty in an integrated shop floor control environment (Q4398902): Difference between revisions

From MaRDI portal
Import240304020342 (talk | contribs)
Set profile property.
ReferenceBot (talk | contribs)
Changed an Item
 
(One intermediate revision by one other user not shown)
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1080/00207549508930144 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2057876265 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Improved Heuristics for Multi-Stage Requirements Planning Systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4176810 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Determining Safety Stock in the Presence of Stochastic Lead Time and Demand / rank
 
Normal rank
Property / cites work
 
Property / cites work: Heuristic and optimal approaches to lot-sizing incorporating backorders: an empirical evaluation / rank
 
Normal rank

Latest revision as of 13:24, 28 May 2024

scientific article; zbMATH DE number 1179612
Language Label Description Also known as
English
MRP systems under supply and process uncertainty in an integrated shop floor control environment
scientific article; zbMATH DE number 1179612

    Statements

    MRP systems under supply and process uncertainty in an integrated shop floor control environment (English)
    0 references
    0 references
    0 references
    1 June 1999
    0 references
    0 references
    integrated shop floor control
    0 references
    multi-level product structure
    0 references
    rolling horizon
    0 references
    MRP system
    0 references
    0 references