MRP systems under supply and process uncertainty in an integrated shop floor control environment
From MaRDI portal
Publication:4398902
DOI10.1080/00207549508930144zbMATH Open0914.90137OpenAlexW2057876265MaRDI QIDQ4398902FDOQ4398902
Authors: Surendra M. Gupta, Louis Brennan
Publication date: 1 June 1999
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207549508930144
Recommendations
- MRP-controlled batch-manufacturing environment under uncertainty
- Model predictive control of dynamic systems with mixed uncertainty and its application to supply chain management
- Uncertainty-dampening methods for reducing MRP system nervousness
- Control and system-theoretic identification of the supply chain dynamics domain for planning, analysis and adaptation of performance under uncertainty
- Integrated supply chain planning under uncertainty using an improved stochastic approach
- Publication:3471837
- Optimal supply planning in MRP environments for assembly systems with random component procurement times
- Inventory Control for a Coproduction System Under Demand Uncertainty
- The Inventory Control Problem for a Supply Chain With a Mixed Type of Demand Uncertainty
- An integrated supply chain configuration model and procurement management under uncertainty: a set-based robust optimization methodology
Cites Work
Cited In (11)
- Measuring system performance of an ERP-based supply chain
- Re-examining the performance of MRP and kanban material control strategies for multi-product flexible manufacturing systems
- Title not available (Why is that?)
- Tactical supply chain planning under uncertainty with an application in the wind turbines industry
- MRP-controlled batch-manufacturing environment under uncertainty
- MRP performance effects due to forecast bias and demand uncertainty
- Optimal supply planning in MRP environments for assembly systems with random component procurement times
- MRP and inventories
- Multi-objective optimization for inventory control in two-level assembly systems under uncertainty of lead times
- Generalized newsboy model to compute the optimal planned lead times in assembly systems
- New lot-sizing formulations for less nervous production schedules
This page was built for publication: MRP systems under supply and process uncertainty in an integrated shop floor control environment
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4398902)