Multi-objective optimization for inventory control in two-level assembly systems under uncertainty of lead times
From MaRDI portal
Publication:975990
DOI10.1016/j.cor.2009.06.002zbMath1188.90009OpenAlexW1970586781MaRDI QIDQ975990
Xavier Delorme, Faicel Hnaien, Alexandre Dolgui
Publication date: 11 June 2010
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.cor.2009.06.002
Related Items (8)
A stochastic programming model for multi-product oriented multi-channel component replenishment ⋮ Diversity of payment contracts in a decentralized assembly system ⋮ Bi-objective optimization of a multi-product multi-period three-echelon supply chain problem under uncertain environments: NSGA-II and NRGA ⋮ Multi-objective optimization for inventory control in two-level assembly systems under uncertainty of lead times ⋮ Markovian queue optimisation analysis with an unreliable server subject to working breakdowns and impatient customers ⋮ Robust design of (s,S) inventory policy parameters in supply chains with demand and lead time uncertainties ⋮ Multilevel production systems with dependent demand with uncertainty of lead times ⋮ Stochastic multi-objective optimization: a survey on non-scalarizing methods
Cites Work
- Unnamed Item
- Unnamed Item
- Multi-objective optimization for inventory control in two-level assembly systems under uncertainty of lead times
- An optimal \((Q,r)\) policy for a multipart assembly system under stochastic part procurement lead times
- Analysis of a single-stage, single-product, stochastic, MRP-controlled assembly system
- Kitting process in a stochastic assembly system
- Multiple criteria optimization: State of the art annotated bibliographic surveys
- Random lead times and expedited orders in \((Q,r)\) inventory systems
- Planning order releases for an assembly system with random operation times
- Optimal supply planning in MRP environments for assembly systems with random component procurement times
- Setting Planned Leadtimes in Serial Production Systems with Tardiness Costs
- Technical Note—The EOQ Model under Stochastic Lead Time
- Joint optimization of lot-sizes, safety stocks and safety lead times in an MRP system
- Correlating MRP system nervousness with forecast errors
- Supply management in assembly systems
- MRP systems under supply and process uncertainty in an integrated shop floor control environment
- Generalized newsboy model to compute the optimal planned lead times in assembly systems
- Assembly-like queues
This page was built for publication: Multi-objective optimization for inventory control in two-level assembly systems under uncertainty of lead times