An optimal \((Q,r)\) policy for a multipart assembly system under stochastic part procurement lead times
From MaRDI portal
Publication:1278134
DOI10.1016/S0377-2217(96)00230-5zbMath0921.90063MaRDI QIDQ1278134
Dayani Sedarage, Okitsugu Fujiwara
Publication date: 18 May 1999
Published in: European Journal of Operational Research (Search for Journal in Brave)
Related Items
A manufacturer-buyer integrated inventory model with stochastic lead times for delivering equal- and/or unequal-sized batches of a lot, An accurate and reliable solution algorithm for the \((Q, r)\) inventory system with a fixed shortage cost, Investing in lead-time variability reduction in a collaborative vendor-buyer supply chain model with stochastic lead time, A manufacturer-buyers integrated inventory model with generic distribution of lead times to deliver equal and/or unequal batch sizes, Optimal purchasing policy in a two-component assembly system with different purchasing contracts for each component, Solving stochastic demand inventory models with uncertain data, Multi-objective optimization for inventory control in two-level assembly systems under uncertainty of lead times, Calculating safety stocks for assembly systems with random component procurement lead times: a branch and bound algorithm
Cites Work