Joint optimization of lot-sizes, safety stocks and safety lead times in an MRP system
From MaRDI portal
Publication:4245250
DOI10.1080/002075497195498zbMATH Open0949.90622OpenAlexW2099990933MaRDI QIDQ4245250FDOQ4245250
Authors: A. Molinder
Publication date: 8 June 1999
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/002075497195498
Recommendations
- Safety Stock versus Safety Time in MRP Controlled Production Systems
- Protective stocks in multi-stage production systems
- An alternative to safety stock policies for multi-level rolling schedule MRP problems
- Optimal supply planning in MRP environments for assembly systems with random component procurement times
- Lot size dependent lead times in a Q,R inventory system
Cited In (14)
- Title not available (Why is that?)
- Lot size approximation based on minimising total delay in a shop with multi-assembly products
- An alternative to safety stock policies for multi-level rolling schedule MRP problems
- A typology and literature review on stochastic multi-echelon inventory models
- Protective stocks in multi-stage production systems
- Safety Stock versus Safety Time in MRP Controlled Production Systems
- Inventory management practices and their implications on perceived planning performance
- Simulations of inventory systems subject to different strategies under uncertain demand and lead-time
- An explicit analysis of the lead time syndrome: stability condition and performance evaluation
- Calculating safety stocks for assembly systems with random component procurement lead times: a branch and bound algorithm
- MRP performance effects due to forecast bias and demand uncertainty
- Optimal supply planning in MRP environments for assembly systems with random component procurement times
- Multi-objective optimization for inventory control in two-level assembly systems under uncertainty of lead times
- Generalized newsboy model to compute the optimal planned lead times in assembly systems
This page was built for publication: Joint optimization of lot-sizes, safety stocks and safety lead times in an MRP system
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4245250)