Lot size approximation based on minimising total delay in a shop with multi-assembly products
From MaRDI portal
Publication:3636756
DOI10.1080/00207540701670511zbMath1163.90467OpenAlexW2043773288MaRDI QIDQ3636756
Babak Shirazi, Iraj Mahdavi, Maghsud Solimanpur, N. Sahebjamnia
Publication date: 29 June 2009
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207540701670511
Cites Work
- Single-point stochastic search algorithms for the multi-level lot-sizing problem
- MRP with flexible constraints: a fuzzy mathematical programming approach
- Heuristic genetic algorithms for general capacitated lot-sizing problems
- Lot sizing with random yields and tardiness costs
- Managing Stochastic Multiproduct Systems: Model, Measures, and Analysis
- Joint optimization of lot-sizes, safety stocks and safety lead times in an MRP system
- The Stochastic Economic Lot Scheduling Problem: Cyclical Base-Stock Policies with Idle Times
- Disassembly analysis for electromechanical products: A graph-based heuristic approach
This page was built for publication: Lot size approximation based on minimising total delay in a shop with multi-assembly products