Supply management in assembly systems
From MaRDI portal
Publication:4287984
DOI10.1002/1520-6750(199312)40:7%3C933::AID-NAV3220400706%3E3.0.CO;2-8zbMATH Open0801.90051OpenAlexW2081771088WikidataQ57186065 ScholiaQ57186065MaRDI QIDQ4287984FDOQ4287984
Authors: Chengbin Chu, Xiaolan Xie, Jean Marie Proth
Publication date: 19 April 1994
Full work available at URL: https://doi.org/10.1002/1520-6750(199312)40:7%3C933::aid-nav3220400706%3E3.0.co;2-8
Recommendations
- scientific article; zbMATH DE number 744086
- Generalized newsboy model to compute the optimal planned lead times in assembly systems
- A simple and effective component procurement policy for stochastic assembly systems
- An optimal \((Q,r)\) policy for a multipart assembly system under stochastic part procurement lead times
Cited In (20)
- Title not available (Why is that?)
- On Modeling the Store of an Assembly Shop by Due Date Processes
- Input control in a batch production system with lead times, due dates and random yields
- Inventory control and delivery time quotation for assembly supply chains
- Managing raw material in supply chains
- A note on the first moment of makespan in an assembly shop
- Supply chain models for an assembly system with preprocessing of raw materials
- Title not available (Why is that?)
- Determination of optimal part delivery dates in a stochastic assembly line
- Synchronization in a two‐supplier assembly system: Combining a fixed lead‐time module with capacitated m<scp>ake‐to‐order</scp> production
- Multilevel production systems with dependent demand with uncertainty of lead times
- Supply chain models for an assembly system with preprocessing of raw materials: a simple and better algorithm
- Calculating safety stocks for assembly systems with random component procurement lead times: a branch and bound algorithm
- Optimal supply planning in MRP environments for assembly systems with random component procurement times
- Multi-objective optimization for inventory control in two-level assembly systems under uncertainty of lead times
- Managing inventory and supply performance in assembly systems with random supply capacity and demand
- Generalized newsboy model to compute the optimal planned lead times in assembly systems
- A simple and effective component procurement policy for stochastic assembly systems
- Safety times for multistage assembly system
- Modeling and analysis of a supply--assembly--store chain
This page was built for publication: Supply management in assembly systems
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4287984)