Input control in a batch production system with lead times, due dates and random yields
From MaRDI portal
Publication:1584793
DOI10.1016/S0377-2217(99)00295-7zbMATH Open0970.90028MaRDI QIDQ1584793FDOQ1584793
Authors: Yunzeng Wang, Yigal Gerchak
Publication date: 5 November 2000
Published in: European Journal of Operational Research (Search for Journal in Brave)
Recommendations
- Input Control for Serial Production Lines Consisting of Processing and Assembly Operations with Random Yields
- Control of a production system with variable yield and random demand
- Lot sizing with random yields and tardiness costs
- Production to order on a two machine line with random yields and rigid demand
- Production Control in Multistage Systems with Variable Yield Losses
Cites Work
- Convex Analysis
- Supply management in assembly systems
- Foundations of inventory management
- Lot Sizing with Random Yields: A Review
- The Structure of Periodic Review Policies in the Presence of Random Yield
- Periodic Review Production Models with Variable Capacity, Random Yield, and Uncertain Demand
- Multistage production to order with rework capability
- Control Limits for Multi-stage Manufacturing Processes with Binomial Yield (Single and Multiple Production Runs)
- Multiple lotsizing with random common-cause yield and rigid demand
- Production Control in Multistage Systems with Variable Yield Losses
- Optimal reject allowance with constant marginal production efficiency
- Dynamic Programming and Systems of Uncertain Duration
- Random Yield, Rework and Scrap in a Multistage Batch Manufacturing Environment
- A Single Bottleneck System with Binomial Yields and Rigid Demand
Cited In (6)
- A newsvendor analysis of a binomial yield production process
- An innovative approach for strategic capacity portfolio planning under uncertainties
- Supplier diversification under binomial yield
- A dynamic programming approach for batch sizing in a multi-stage production process with random yields
- Timing control points via simulation for production systems under random disturbances
- Optimal procurement and production planning for multi-product multi-stage production under yield uncertainty
This page was built for publication: Input control in a batch production system with lead times, due dates and random yields
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1584793)