Control Limits for Multi-stage Manufacturing Processes with Binomial Yield (Single and Multiple Production Runs)
From MaRDI portal
Publication:4868831
DOI10.1057/jors.1996.9zbMath0841.90068OpenAlexW2018123395MaRDI QIDQ4868831
Publication date: 29 April 1996
Published in: Journal of the Operational Research Society (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1057/jors.1996.9
lot sizingcontrol limitsmulti-stage processesstochastic yieldseries of production runssingle make-to-order demand
Related Items (9)
A newsvendor analysis of a binomial yield production process ⋮ Optimizing a production system with rework and equal sized batch shipments ⋮ Serial production systems with random yield and rigid demand: a heuristic ⋮ An evolutionary algorithm and discrete event simulation for optimizing inspection strategies for multi-stage processes ⋮ Simple optimal replenishment and disposal policies for a product recovery system with leadtimes ⋮ A particle swarm algorithm for inspection optimization in serial multi-stage processes ⋮ Optimal procurement and production planning for multi-product multi-stage production under yield uncertainty ⋮ Supplier diversification under binomial yield ⋮ Input control in a batch production system with lead times, due dates and random yields
This page was built for publication: Control Limits for Multi-stage Manufacturing Processes with Binomial Yield (Single and Multiple Production Runs)