Random Yield, Rework and Scrap in a Multistage Batch Manufacturing Environment
From MaRDI portal
Publication:5966684
DOI10.1287/opre.40.3.551zbMath0825.90520OpenAlexW2039790425MaRDI QIDQ5966684
Publication date: 16 January 1993
Published in: Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/opre.40.3.551
Reliability, availability, maintenance, inspection in operations research (90B25) Production models (90B30) Dynamic programming (90C39) Markov and semi-Markov decision processes (90C40) Marketing, advertising (90B60)
Related Items (13)
Optimizing a production system with rework and equal sized batch shipments ⋮ Optimal batch sizing in a multi-stage production system with rework consideration ⋮ Serial production systems with random yield and rigid demand: a heuristic ⋮ Production to order on a two machine line with random yields and rigid demand ⋮ Single bottleneck systems with proportional expected yields and rigid demand ⋮ Optimal procurement and production planning for multi-product multi-stage production under yield uncertainty ⋮ Lot sizing with random yields and tardiness costs ⋮ Disposal versus rework -- inventory control in a production system with random yield ⋮ Lot-sizing two-echelon assembly systems with random yields and rigid demand ⋮ A two-bottleneck system with binomial yields and rigid demand ⋮ Optimal yield improvement in multi-stage manufacturing systems ⋮ Input control in a batch production system with lead times, due dates and random yields ⋮ Reducing the cost of defects in multistage production systems: A budget allocation perspective
This page was built for publication: Random Yield, Rework and Scrap in a Multistage Batch Manufacturing Environment