Production to order on a two machine line with random yields and rigid demand
From MaRDI portal
(Redirected from Publication:1129928)
Recommendations
- Lot-sizing two-echelon assembly systems with random yields and rigid demand
- Serial production systems with random yield and rigid demand: a heuristic
- Production scheduling in a flexible manufacturing system under random demand
- Optimal production rates in a deterministic two-product manufacturing system
- An empirical investigation of the two-moment approximation for production lines
- scientific article; zbMATH DE number 758440
- The analysis of an unreliable two-machine production line with random processing times
- Optimal production decision for a risk‐averse manufacturer faced with random yield and stochastic demand
Cites work
- A Single Bottleneck System with Binomial Yields and Rigid Demand
- Dynamic Programming and Systems of Uncertain Duration
- Multiple lotsizing in production to order with random yields: review of recent advances
- Multiple lotsizing with random common-cause yield and rigid demand
- Multistage production systems with random yield: heuristics and optimality
- Optimal reject allowance with constant marginal production efficiency
- Production Control in Multistage Systems with Variable Yield Losses
- Random Yield, Rework and Scrap in a Multistage Batch Manufacturing Environment
Cited in
(11)- Lot-sizing two-echelon assembly systems with random yields and rigid demand
- Optimal Production Sequence for a Product with Matching Components
- A newsvendor analysis of a binomial yield production process
- Serial production systems with random yield and rigid demand: a heuristic
- Optimizing the output of batches of products and the intensity of their manufacture under random demand
- A two-bottleneck system with binomial yields and rigid demand
- Part Dispatch in Random Yield Multistage Flexible Test Systems for Printed Circuit Boards
- Control of a production system with variable yield and random demand
- Input control in a batch production system with lead times, due dates and random yields
- A Single Bottleneck System with Binomial Yields and Rigid Demand
- Modified base-stock policies for semiconductor production system with dependent yield rates
This page was built for publication: Production to order on a two machine line with random yields and rigid demand
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1129928)