Multistage production systems with random yield: heuristics and optimality
From MaRDI portal
Publication:4394368
Recommendations
- Serial production systems with random yield and rigid demand: a heuristic
- Algorithms and heuristics for variable-yield lot sizing
- Lot-sizing two-echelon assembly systems with random yields and rigid demand
- Lot sizes in serial manufacturing with random yields
- The multiple lot sizing problem of a serial production system with interrupted geometric yields, rigid demand and Pentico's heuristic
Cites work
Cited in
(20)- Production to order on a two machine line with random yields and rigid demand
- Single bottleneck systems with proportional expected yields and rigid demand
- Optimal procurement and production planning for multi-product multi-stage production under yield uncertainty
- The multiple lot sizing problem of a serial production system with interrupted geometric yields, rigid demand and Pentico's heuristic
- A two-bottleneck system with binomial yields and rigid demand
- Lot-sizing two-echelon assembly systems with random yields and rigid demand
- The value of real time yield information in multi-stage inventory systems -- exact and heuristic approaches
- Serial production systems with random yield and rigid demand: a heuristic
- Multistage production to order with rework capability
- Technical Note—Note on “Myopic Heuristics for the Random Yield Problem”
- Composite stage effects in unbalancing of series production systems
- Algorithms and heuristics for variable-yield lot sizing
- Production Control in Multistage Systems with Variable Yield Losses
- scientific article; zbMATH DE number 4095191 (Why is no real title available?)
- Part Dispatch in Random Yield Multistage Flexible Test Systems for Printed Circuit Boards
- Discontinuous optimization in a class of multi-stage production systems
- Efficient, Effective Lot Sizing for Multistage Production Systems
- Lot sizing when yields increase during the production run
- A dynamic programming approach for batch sizing in a multi-stage production process with random yields
- Modified base-stock policies for semiconductor production system with dependent yield rates
This page was built for publication: Multistage production systems with random yield: heuristics and optimality
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4394368)