Lot sizing when yields increase during the production run
From MaRDI portal
Recommendations
- Algorithms and heuristics for variable-yield lot sizing
- Multistage production systems with random yield: heuristics and optimality
- Optimal Lot Sizes with Geometric Production Yield and Rigid Demand
- Lot sizes in serial manufacturing with random yields
- Lot sizing with random yields and tardiness costs
Cited in
(5)- Lot sizing with random yields and tardiness costs
- The use of minor setups within production cycles to improve product quality and yield
- Optimal Lot Sizes with Geometric Production Yield and Rigid Demand
- Algorithms and heuristics for variable-yield lot sizing
- Stochastic Comparisons in Production Yield Management
This page was built for publication: Lot sizing when yields increase during the production run
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q5690155)