Modified base-stock policies for semiconductor production system with dependent yield rates
From MaRDI portal
Publication:992597
DOI10.1016/J.EJOR.2010.04.027zbMATH Open1205.90110OpenAlexW2048866813MaRDI QIDQ992597FDOQ992597
Authors: Huei-Chuen Huang, Haiqing Song
Publication date: 9 September 2010
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2010.04.027
Recommendations
- A stochastic dynamic programming approach-based yield management with substitution and uncertainty in semiconductor manufacturing
- Co-Production Processes with Random Yields in the Semiconductor Industry
- Multistage production systems with random yield: heuristics and optimality
- Lot-sizing two-echelon assembly systems with random yields and rigid demand
- Production to order on a two machine line with random yields and rigid demand
Case-oriented studies in operations research (90B90) Inventory, storage, reservoirs (90B05) Production models (90B30)
Cites Work
- The stochastic location model with risk pooling
- Single-period multiproduct inventory models with substitution
- Ordering Policies in an environment of Stochastic Yields and Substitutable Demands
- Approximations of Dynamic, Multilocation Production and Inventory Problems
- Modelling the Costs and Benefits of Delayed Product Differentiation
- Random yield and random demand in a production system with downward substitution
- Note—Effects of Centralization on Expected Costs in a Multi-Location Newsboy Problem
- Risk-Pooling Along a Fixed Delivery Route Using a Dynamic Inventory-Allocation Policy
Cited In (3)
- Adaptive robust optimization for lot-sizing under yield uncertainty
- A stochastic dynamic programming approach-based yield management with substitution and uncertainty in semiconductor manufacturing
- A study on the effect of yield uncertainty in price-setting newsvendor models with additive-multiplicative demand
This page was built for publication: Modified base-stock policies for semiconductor production system with dependent yield rates
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q992597)