Optimal supply planning in MRP environments for assembly systems with random component procurement times
DOI10.1080/00207540802273827zbMATH Open1157.90317OpenAlexW4302084355MaRDI QIDQ3541192FDOQ3541192
Authors: Alexandre Dolgui, Faicel Hnaien, Mohamed-Aly Ould Louly
Publication date: 25 November 2008
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207540802273827
Recommendations
- Key performance indicators for supply planning of multilevel serial systems with stochastic lead times
- Multi-objective optimization for inventory control in two-level assembly systems under uncertainty of lead times
- Joint optimization of lot-sizes, safety stocks and safety lead times in an MRP system
- A robust optimization model for agile and build-to-order supply chain planning under uncertainties
- Multilevel production systems with dependent demand with uncertainty of lead times
branch and bounddiscrete modelassembly systemsrandom lead timessupply planningMRP environmentplanned lead times optimization
Polyhedral combinatorics, branch-and-bound, branch-and-cut (90C57) Inventory, storage, reservoirs (90B05)
Cites Work
- Title not available (Why is that?)
- On Properties of Stochastic Inventory Systems
- Supply management in assembly systems
- A Dynamic Inventory Model with Stochastic Lead Times
- Setting Planned Leadtimes in Serial Production Systems with Tardiness Costs
- Stochastic leadtimes in continuous-time inventory models
- Using the Deterministic EOQ Formula in Stochastic Inventory Control
- Technical Note—The EOQ Model under Stochastic Lead Time
- Analysis of a single-stage, single-product, stochastic, MRP-controlled assembly system
- Joint optimization of lot-sizes, safety stocks and safety lead times in an MRP system
- Correlating MRP system nervousness with forecast errors
- MRP systems under supply and process uncertainty in an integrated shop floor control environment
- Generalized newsboy model to compute the optimal planned lead times in assembly systems
- The (s,Q) inventory model with Erlang lead time and deterministic demand
- Parameters affecting the effectiveness of MRP systems: A review
- The effects of partial order release and component reservation on inventory and customer service performance in an MRP environment
Cited In (8)
- Build-pack planning for hard disk drive assembly with approved vendor matrices and stochastic demands
- Sales and operations planning in systems with order configuration uncertainty
- Key performance indicators for supply planning of multilevel serial systems with stochastic lead times
- Material allocation in MRP with tardiness penalties
- Multilevel production systems with dependent demand with uncertainty of lead times
- Multi-objective optimization for inventory control in two-level assembly systems under uncertainty of lead times
- MRP systems under supply and process uncertainty in an integrated shop floor control environment
- Robust design of (s,S) inventory policy parameters in supply chains with demand and lead time uncertainties
This page was built for publication: Optimal supply planning in MRP environments for assembly systems with random component procurement times
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3541192)