Generalized newsboy model to compute the optimal planned lead times in assembly systems
From MaRDI portal
Publication:4706334
DOI10.1080/00207540210158825zbMath1064.90531OpenAlexW1989737774MaRDI QIDQ4706334
Alexandre Dolgui, M.-A. Ould-Louly
Publication date: 2002
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207540210158825
Related Items
Optimal supply planning in MRP environments for assembly systems with random component procurement times ⋮ Inventory control of raw materials under stochastic and seasonal lead times ⋮ Multi-objective optimization for inventory control in two-level assembly systems under uncertainty of lead times ⋮ Calculating safety stocks for assembly systems with random component procurement lead times: a branch and bound algorithm
Cites Work
- Analysis of a single-stage, single-product, stochastic, MRP-controlled assembly system
- A Dynamic Model for Requirements Planning with Application to Supply Chain Optimization
- An Inventory Model with Order Crossover
- Joint optimization of lot-sizes, safety stocks and safety lead times in an MRP system
- The effects of partial order release and component reservation on inventory and customer service performance in an MRP environment
- Parameters affecting the effectiveness of MRP systems: A review
- Correlating MRP system nervousness with forecast errors
- Supply management in assembly systems
- MRP systems under supply and process uncertainty in an integrated shop floor control environment
- MPS with multiple freeze fences in multi-product multi-level MRP systems