Correlating MRP system nervousness with forecast errors
From MaRDI portal
Publication:4245646
Recommendations
- Measurement of instability in multi-level MRP systems
- Schedule instability, service level and cost in a material requirements planning system
- Lot-sizing rules and freezing the master production schedule in material requirements planning systems under demand uncertainty
- Evaluating dampening effects of alternative lot-sizing rules to reduce MRP system nervousness
- Uncertainty-dampening methods for reducing MRP system nervousness
Cited in
(8)- Uncertainty under MRP-planned manufacture: Review and categorization
- scientific article; zbMATH DE number 4139474 (Why is no real title available?)
- The effect of lot sizing rules on order variability
- MRP performance effects due to forecast bias and demand uncertainty
- Multi-objective optimization for inventory control in two-level assembly systems under uncertainty of lead times
- Optimal supply planning in MRP environments for assembly systems with random component procurement times
- Evaluating dampening effects of alternative lot-sizing rules to reduce MRP system nervousness
- Generalized newsboy model to compute the optimal planned lead times in assembly systems
This page was built for publication: Correlating MRP system nervousness with forecast errors
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4245646)