Correlating MRP system nervousness with forecast errors
From MaRDI portal
(Redirected from Publication:4245646)
Recommendations
- Measurement of instability in multi-level MRP systems
- Schedule instability, service level and cost in a material requirements planning system
- Lot-sizing rules and freezing the master production schedule in material requirements planning systems under demand uncertainty
- Evaluating dampening effects of alternative lot-sizing rules to reduce MRP system nervousness
- Uncertainty-dampening methods for reducing MRP system nervousness
Cited in
(10)- MRP performance effects due to forecast bias and demand uncertainty
- The effect of lot sizing rules on order variability
- scientific article; zbMATH DE number 4139474 (Why is no real title available?)
- Optimal supply planning in MRP environments for assembly systems with random component procurement times
- Measurement of instability in multi-level MRP systems
- The impact of institutional factors on forecast accuracy: manufacturing executives perspective
- Uncertainty under MRP-planned manufacture: Review and categorization
- Generalized newsboy model to compute the optimal planned lead times in assembly systems
- Evaluating dampening effects of alternative lot-sizing rules to reduce MRP system nervousness
- Multi-objective optimization for inventory control in two-level assembly systems under uncertainty of lead times
This page was built for publication: Correlating MRP system nervousness with forecast errors
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4245646)