Correlating MRP system nervousness with forecast errors
From MaRDI portal
Publication:4245646
DOI10.1080/002075498192904zbMATH Open0945.90561OpenAlexW2155911304MaRDI QIDQ4245646FDOQ4245646
Authors:
Publication date: 11 October 2000
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/002075498192904
Recommendations
- Measurement of instability in multi-level MRP systems
- Schedule instability, service level and cost in a material requirements planning system
- Lot-sizing rules and freezing the master production schedule in material requirements planning systems under demand uncertainty
- Evaluating dampening effects of alternative lot-sizing rules to reduce MRP system nervousness
- Uncertainty-dampening methods for reducing MRP system nervousness
Cited In (8)
- Uncertainty under MRP-planned manufacture: Review and categorization
- Title not available (Why is that?)
- The effect of lot sizing rules on order variability
- MRP performance effects due to forecast bias and demand uncertainty
- Optimal supply planning in MRP environments for assembly systems with random component procurement times
- Multi-objective optimization for inventory control in two-level assembly systems under uncertainty of lead times
- Evaluating dampening effects of alternative lot-sizing rules to reduce MRP system nervousness
- Generalized newsboy model to compute the optimal planned lead times in assembly systems
This page was built for publication: Correlating MRP system nervousness with forecast errors
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4245646)