Multilevel production systems with dependent demand with uncertainty of lead times
From MaRDI portal
Publication:1793230
DOI10.1155/2016/4967341zbMath1400.90161OpenAlexW2487095214WikidataQ59131444 ScholiaQ59131444MaRDI QIDQ1793230
Ahmad Makui, Mehdi Heydari, Haibatolah Sadeghi
Publication date: 12 October 2018
Published in: Mathematical Problems in Engineering (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1155/2016/4967341
Related Items (1)
Cites Work
- A partial backlogging inventory model for deteriorating items with fluctuating selling price and purchasing cost
- Multi-objective optimization for inventory control in two-level assembly systems under uncertainty of lead times
- Optimal decision for fashion supply chains with service level constraint and controllable lead time
- Optimal supply planning in MRP environments for assembly systems with random component procurement times
- Setting Planned Leadtimes in Serial Production Systems with Tardiness Costs
- Parameters affecting the effectiveness of MRP systems: A review
- Supply management in assembly systems
- The Effect of Leadtime Uncertainty in a Simple Stochastic Inventory Model
This page was built for publication: Multilevel production systems with dependent demand with uncertainty of lead times