Planning order releases for an assembly system with random operation times
From MaRDI portal
Publication:2576667
DOI10.1007/s00291-004-0186-2zbMath1124.90310OpenAlexW1819130314MaRDI QIDQ2576667
Publication date: 14 December 2005
Published in: OR Spectrum (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s00291-004-0186-2
Related Items (8)
Setting optimal planned leadtimes in configure-to-order assembly systems ⋮ Push verse pull: inventory-leadtime tradeoff for managing system variability ⋮ Measurement and optimization of responsiveness in supply chain networks with queueing structures ⋮ Simultaneous optimization of capacity and planned lead time in a two-stage production system with different customer due dates ⋮ Safety times for multistage assembly system ⋮ A typology and literature review on stochastic multi-echelon inventory models ⋮ Multi-objective optimization for inventory control in two-level assembly systems under uncertainty of lead times ⋮ Newsvendor equations for production networks
This page was built for publication: Planning order releases for an assembly system with random operation times