Setting optimal planned leadtimes in configure-to-order assembly systems
From MaRDI portal
Publication:1622813
DOI10.1016/j.ejor.2018.08.036zbMath1403.90126OpenAlexW2889107999WikidataQ129332238 ScholiaQ129332238MaRDI QIDQ1622813
Sjors Jansen, Zümbül Atan, Ton G. de Kok, Ivo J. B. F. Adan
Publication date: 19 November 2018
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://research.tue.nl/nl/publications/8bb322e5-50fc-4e59-a476-e1b1b9636fe7
Transportation, logistics and supply chain management (90B06) Production models (90B30) Inventory, storage, reservoirs (90B05)
Related Items (5)
Stochastic program for disassembly lot-sizing under uncertain component refurbishing lead times ⋮ Push verse pull: inventory-leadtime tradeoff for managing system variability ⋮ Optimisation model for multi-item multi-echelon supply chains with nested multi-level products ⋮ Newsvendor equations for production networks ⋮ Optimal control policies for an inventory system with commitment lead time
Cites Work
- Unnamed Item
- Setting planned lead times for multi-operation jobs
- Assemble-to-order systems: a review
- Planning order releases for an assembly system with random operation times
- Setting Planned Leadtimes in Serial Production Systems with Tardiness Costs
- Setting Planned Leadtimes in Capacity Requirements Planning
- Optimal Leadtimes Planning in a Serial Production System
- Safety Stock versus Safety Time in MRP Controlled Production Systems
This page was built for publication: Setting optimal planned leadtimes in configure-to-order assembly systems