Stochastic program for disassembly lot-sizing under uncertain component refurbishing lead times
From MaRDI portal
Publication:2160509
Recommendations
- Capacitated disassembly scheduling under stochastic yield and demand
- Capacitated disassembly scheduling with random demand
- Capacitated disassembly lot-sizing problem with disposal decisions for multiple product types with parts commonality
- Integrated disassembly and reprocessing lot-sizing for multi-level structured products in remanufacturing systems
- A multi-stage stochastic integer programming approach for a multi-echelon lot-sizing problem with returns and lost sales
Cites work
- A branch and bound algorithm for disassembly scheduling with assembly product structure
- A Lagrangean heuristic algorithm for disassembly scheduling with capacity constraints
- A multi-stage stochastic integer programming approach for a multi-echelon lot-sizing problem with returns and lost sales
- A stochastic model for operating room planning with elective and emergency demand for surgery
- A stochastic production planning problem in hybrid manufacturing and remanufacturing systems with resource capacity planning
- A two-stage heuristic for disassembly scheduling with assembly product structure
- Aggregation and discretization in multistage stochastic programming
- An efficient computational method for a stochastic dynamic lot-sizing problem under service-level constraints
- An evaluation of order release strategies in a remanufacturing environment
- An optimal solution for the stochastic version of the Wagner-Whitin dynamic lot-size model
- Calculating safety stocks for assembly systems with random component procurement lead times: a branch and bound algorithm
- Capacitated disassembly scheduling under stochastic yield and demand
- Capacitated disassembly scheduling with random demand
- Computational Complexity of the Capacitated Lot Size Problem
- Constraint programming for computing non-stationary \((R, S)\) inventory policies
- Deterministic Production Planning: Algorithms and Complexity
- Disassembly EOQ models with price-sensitive demands
- Disassembly Modeling for Assembly, Maintenance, Reuse and Recycling
- Disassembly scheduling with parts commonality using Petri nets with timestamps.
- Disassembly scheduling: literature review and future research directions
- Heuristics for demand-driven disassembly planning
- Heuristics for solving disassemble-to-order problems with stochastic yields
- scientific article; zbMATH DE number 5017341 (Why is no real title available?)
- scientific article; zbMATH DE number 854710 (Why is no real title available?)
- Newsvendor equations for production networks
- Scenario reduction in stochastic programming
- Scenario reduction in stochastic programming with respect to discrepancy distances
- Scheduling disassembly
- Setting optimal planned leadtimes in configure-to-order assembly systems
- Sustainable operations
- The sample average approximation method for stochastic discrete optimization
- Towards circular economy in production planning: challenges and opportunities
Cited in
(4)- Master disassembly scheduling in a remanufacturing system with stochastic routings
- Optimal trade-in and refurbishment strategies for durable goods
- Collection-disassembly-delivery problem of disassembly centers in a reverse logistics network
- Adaptive robust optimization for lot-sizing under yield uncertainty
This page was built for publication: Stochastic program for disassembly lot-sizing under uncertain component refurbishing lead times
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q2160509)