A branch and bound algorithm for disassembly scheduling with assembly product structure
From MaRDI portal
(Redirected from Publication:3617337)
Recommendations
Cited in
(17)- A branch and bound algorithm for the two-stage assembly scheduling problem
- A branch and bound algorithm for a production scheduling problem in an assembly system under due date constraints
- Capacitated disassembly scheduling under stochastic yield and demand
- Stochastic program for disassembly lot-sizing under uncertain component refurbishing lead times
- A novel decomposition-based method for solving general-product structure assemble-to-order systems
- Towards circular economy in production planning: challenges and opportunities
- On the cooperation of recycling operations
- Capacitated disassembly scheduling with random demand
- Job-shop production scheduling with reverse flows
- An Outer Approximation Algorithm for Capacitated Disassembly Scheduling Problem with Parts Commonality and Random Demand
- A Lagrangean heuristic algorithm for disassembly scheduling with capacity constraints
- Machine Scheduling for Multi-product Disassembly
- A two-stage heuristic for disassembly scheduling with assembly product structure
- Disassembly scheduling: literature review and future research directions
- KI 2005: Advances in Artificial Intelligence
- Integrated disassembly and reprocessing lot-sizing for multi-level structured products in remanufacturing systems
- Disassembly line optimization with reinforcement learning
This page was built for publication: A branch and bound algorithm for disassembly scheduling with assembly product structure
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3617337)