PERT scheduling with convex cost functions. (Q1853737): Difference between revisions

From MaRDI portal
Added link to MaRDI item.
ReferenceBot (talk | contribs)
Changed an Item
 
(One intermediate revision by one other user not shown)
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4263700 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4096964 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4396949 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Resource-constrained project scheduling: Notation, classification, models, and methods / rank
 
Normal rank
Property / cites work
 
Property / cites work: One-Processor Scheduling with Symmetric Earliness and Tardiness Penalties / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4938774 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal timing schedules in earliness-tardiness single machine sequencing / rank
 
Normal rank

Latest revision as of 10:31, 5 June 2024

scientific article
Language Label Description Also known as
English
PERT scheduling with convex cost functions.
scientific article

    Statements

    PERT scheduling with convex cost functions. (English)
    0 references
    0 references
    0 references
    22 January 2003
    0 references
    This paper deals with the problem of finding a minimum cost schedule for a set of dependent activities when a convex cost function is attached to the starting time of each activity. A first optimality necessary and sufficient condition bearing on the head and tail blocks of a schedule is first established. A second such condition that uses the spanning active equality trees of a schedule leads to design a generic algorithm for the general case. When the cost function is the usual earliness--tardiness linear function with assymetric and independent penalty coefficients, the problem is shown to be solved in \(O(n\max\{n,m\})\). Finally, the special cases when the precedence graph is an intree or a family of chains are then also shown to be solved by efficient polynomial algorithms.
    0 references
    Deterministic
    0 references
    PERT scheduling
    0 references
    Convex cost functions
    0 references
    Polynomial algorithm