Two-machine open shop scheduling with secondary criteria (Q3044040): Difference between revisions

From MaRDI portal
Created claim: Wikidata QID (P12): Q57633937, #quickstatements; #temporary_batch_1711055989931
ReferenceBot (talk | contribs)
Changed an Item
 
Property / cites work
 
Property / cites work: A comparison of heuristic algorithms for flow shop scheduling problems with setup times and limited batch size / rank
 
Normal rank
Property / cites work
 
Property / cites work: Open Shop Scheduling to Minimize Finish Time / rank
 
Normal rank
Property / cites work
 
Property / cites work: Open shop scheduling with makespan and total completion time criteria / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling ordered open shops / rank
 
Normal rank
Property / cites work
 
Property / cites work: Two machine open shop scheduling problems with bi-criteria / rank
 
Normal rank
Property / cites work
 
Property / cites work: Multiple and bicriteria scheduling: A literature survey / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q5485395 / rank
 
Normal rank

Latest revision as of 18:48, 6 June 2024

scientific article
Language Label Description Also known as
English
Two-machine open shop scheduling with secondary criteria
scientific article

    Statements

    Two-machine open shop scheduling with secondary criteria (English)
    0 references
    0 references
    0 references
    0 references
    10 August 2004
    0 references
    open shop scheduling
    0 references
    secondary criteria
    0 references
    constructive and iterative heuristics
    0 references
    threshold accepting
    0 references
    simulated annealing
    0 references
    empirical evaluation
    0 references

    Identifiers