Two-machine open shop scheduling with secondary criteria (Q3044040): Difference between revisions
From MaRDI portal
Created claim: Wikidata QID (P12): Q57633937, #quickstatements; #temporary_batch_1711055989931 |
ReferenceBot (talk | contribs) Changed an Item |
||
Property / cites work | |||
Property / cites work: A comparison of heuristic algorithms for flow shop scheduling problems with setup times and limited batch size / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: Open Shop Scheduling to Minimize Finish Time / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: Open shop scheduling with makespan and total completion time criteria / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: Scheduling ordered open shops / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: Two machine open shop scheduling problems with bi-criteria / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: Multiple and bicriteria scheduling: A literature survey / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: Q5485395 / rank | |||
Normal rank |
Latest revision as of 18:48, 6 June 2024
scientific article
Language | Label | Description | Also known as |
---|---|---|---|
English | Two-machine open shop scheduling with secondary criteria |
scientific article |
Statements
Two-machine open shop scheduling with secondary criteria (English)
0 references
10 August 2004
0 references
open shop scheduling
0 references
secondary criteria
0 references
constructive and iterative heuristics
0 references
threshold accepting
0 references
simulated annealing
0 references
empirical evaluation
0 references
0 references