Two-machine open shop scheduling with secondary criteria
DOI10.1111/1475-3995.00407zbMath1087.90030OpenAlexW2112204631WikidataQ57633937 ScholiaQ57633937MaRDI QIDQ3044040
Jatinder N. D. Gupta, Gunnar Wulkenhaar, Frank Werner
Publication date: 10 August 2004
Published in: International Transactions in Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1111/1475-3995.00407
simulated annealingthreshold acceptingempirical evaluationopen shop schedulingconstructive and iterative heuristicssecondary criteria
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Related Items (2)
Cites Work
- Unnamed Item
- Scheduling ordered open shops
- Multiple and bicriteria scheduling: A literature survey
- Two machine open shop scheduling problems with bi-criteria
- A comparison of heuristic algorithms for flow shop scheduling problems with setup times and limited batch size
- Open shop scheduling with makespan and total completion time criteria
- Open Shop Scheduling to Minimize Finish Time
This page was built for publication: Two-machine open shop scheduling with secondary criteria