Publication | Date of Publication | Type |
---|
Incorporating preventive maintenance into the m-machine no-wait flow-shop scheduling problem with total flow-time minimization: a computational study | 2022-12-23 | Paper |
Single machine scheduling problem with batch setups involving positional deterioration effects and multiple rate-modifying activities | 2022-12-23 | Paper |
Supply Chain Coordination with a Risk-Averse Retailer and a Combined Buy-Back and Revenue Sharing Contract | 2019-10-30 | Paper |
Minimizing the makespan on two identical parallel machines with mold constraints | 2019-02-19 | Paper |
An improved L-shaped method for solving process flexibility design problems | 2018-10-12 | Paper |
A comprehensive review of flowshop group scheduling literature | 2018-07-12 | Paper |
Family scheduling with batch availability in flow shops to minimize makespan | 2018-04-13 | Paper |
Two-machine flowshop scheduling with three-operation jobs subject to a fixed job sequence | 2017-09-01 | Paper |
A hybrid Lagrangian-simulated annealing-based heuristic for the parallel-machine capacitated lot-sizing and scheduling problem with sequence-dependent setup times | 2016-11-17 | Paper |
A heuristic for maximizing investigation effectiveness of digital forensic cases involving multiple investigators | 2016-11-17 | Paper |
Scheduling identical parallel machines with fixed delivery dates to minimize total tardiness | 2016-10-06 | Paper |
Scheduling Identical Parallel Machines with a Fixed Number of Delivery Dates | 2016-05-19 | Paper |
A second order cone programming approach for semi-supervised learning | 2015-12-08 | Paper |
The ordinal consistency of an incomplete reciprocal preference relation | 2015-06-23 | Paper |
Flow shop batching and scheduling with sequence-dependent setup times | 2015-01-22 | Paper |
A three-phase algorithm for flowshop scheduling with blocking to minimize makespan | 2012-11-15 | Paper |
Using simulated annealing to schedule a flowshop manufacturing cell with sequence-dependent family setup times | 2010-11-07 | Paper |
Permutation and non-permutation schedules for the flowline manufacturing cell with sequence dependent family setups | 2010-10-25 | Paper |
Single machine scheduling with sequence-dependent family setups to minimize maximum lateness | 2010-09-02 | Paper |
Minimizing flowtime subject to optimal makespan on two identical parallel machines | 2010-03-06 | Paper |
Makespan distribution of permutation flowshop schedules | 2009-08-28 | Paper |
Supply chain scheduling: Just-in-time environment | 2008-09-03 | Paper |
Single machine group scheduling with family setups to minimize total tardiness | 2008-05-06 | Paper |
Single machine scheduling with family setups to minimize total earliness and tardiness | 2008-01-21 | Paper |
https://portal.mardi4nfdi.de/entity/Q3436602 | 2007-05-11 | Paper |
Effect of technological breakthroughs on electronic markets | 2007-01-24 | Paper |
A penalty-based heuristic algorithm for the permutation flowshop scheduling problem with sequence-dependent set-up times | 2006-07-06 | Paper |
Minimizing flow time in a flow-line manufacturing cell with family setup times | 2006-04-11 | Paper |
Flowshop scheduling research after five decades | 2005-11-04 | Paper |
A review of TSP based approaches for flowshop scheduling | 2005-11-04 | Paper |
Performance guarantees for flowshop heuristics to minimize makespan | 2005-11-04 | Paper |
Generating efficient schedules for identical parallel machines involving flow-time and tardy jobs | 2005-09-28 | Paper |
A review and classification of heuristics for permutation flow-shop scheduling with makespan objective | 2005-05-23 | Paper |
Maintenance policies for a production system with constrained production rate and buffer capacity | 2005-04-26 | Paper |
Comparative evaluation of MILP flowshop models | 2005-04-26 | Paper |
Insights into two solution procedures for the single machine tardiness problem | 2005-03-14 | Paper |
Scheduling tasks on a flexible manufacturing machine to minimize tool change delays | 2005-03-08 | Paper |
Minimising makespan in the two-machine flow-shop with release times | 2005-01-19 | Paper |
Two-machine flow shop scheduling with nonregular criteria | 2005-01-17 | Paper |
Operational and financial effectiveness of e-collaboration tools in supply chain integration | 2004-08-16 | Paper |
Scheduling three-operation jobs in a two-machine flow shop to minimize makespan | 2004-08-10 | Paper |
Two-machine open shop scheduling with secondary criteria | 2004-08-10 | Paper |
Two-machine flowshop scheduling with a secondary criterion | 2003-05-14 | Paper |
Minimizing makespan subject to minimum flowtime on two identical parallel machines | 2002-08-26 | Paper |
Heuristics for hybrid flow shops with controllable processing times and assignable due dates | 2002-07-11 | Paper |
https://portal.mardi4nfdi.de/entity/Q2781964 | 2002-07-02 | Paper |
Local search heuristics for two-stage flow shop problems with secondary criterion | 2002-02-13 | Paper |
Two-Machine No-Wait Flow Shop Scheduling with Missing Operations | 2001-11-26 | Paper |
Comparative evaluation of genetic algorithm and backpropagation for training neural networks | 2001-10-14 | Paper |
https://portal.mardi4nfdi.de/entity/Q2712366 | 2001-07-02 | Paper |
Neural networks in business: Techniques and applications for the operations researcher | 2001-06-10 | Paper |
Scheduling a flowline manufacturing cell with sequence dependent family setup times | 2000-11-23 | Paper |
Minimizing tardy jobs in a two-stage hybrid flowshop | 2000-10-09 | Paper |
Minimizing makespan subject to minimum total flow-time on identical parallel machines | 2000-09-14 | Paper |
Minimizing tardy jobs in a flowshop with common due date | 2000-03-19 | Paper |
Single-machine scheduling to minimize maximum tardiness with minimum number of tardy jobs | 2000-01-11 | Paper |
Selecting Scheduling Heuristics Using Neural Networks | 2000-01-01 | Paper |
A flowshop scheduling problem with two operations per job | 1999-06-17 | Paper |
A framework for decision support systems of scheduling problems | 1999-02-28 | Paper |
Genetic algorithms for the two-stage bicriteria flowshop problem | 1999-02-22 | Paper |
Two-stage no-wait scheduling models with setup and removal times separated | 1998-06-22 | Paper |
Single machine hierarchical scheduling with customer orders and multiple job classes | 1998-01-28 | Paper |
Two-machine flowshop scheduling to minimize the number of tardy jobs | 1997-11-25 | Paper |
Batch scheduling to minimize maximum lateness | 1997-11-19 | Paper |
Scheduling a two-stage hybrid flow shop with parallel machines at the first stage | 1997-06-16 | Paper |
Comparative evaluation of heuristic algorithms for the single machine scheduling problem with two operations per job and time-lags | 1997-01-07 | Paper |
A Savings Index Heuristic Algorithm for Flowshop Scheduling with Sequence Dependent Set-up Times | 1996-10-22 | Paper |
Flowshop scheduling with dominant machines | 1995-11-23 | Paper |
Lot streaming in three-stage production processes | 1995-11-09 | Paper |
Scheduling a two-stage hybrid flowshop with separable setup and removal times | 1994-09-15 | Paper |
The two-machine flowshop scheduling problem with total tardiness | 1989-01-01 | Paper |
Single facility scheduling with multiple job classes | 1988-01-01 | Paper |
Two-Stage, Hybrid Flowshop Scheduling Problem | 1988-01-01 | Paper |
Generating improved dominance conditions for the flowshop problem | 1987-01-01 | Paper |
https://portal.mardi4nfdi.de/entity/Q3806968 | 1987-01-01 | Paper |
The two-machine sequence dependent flowshop scheduling problem | 1986-01-01 | Paper |
Polynomial approximation technique for dynamic optimization problems | 1986-01-01 | Paper |
FLOWSHOP SCHEDULES WITH SEQUENCE DEPENDENT SETUP TIMES | 1986-01-01 | Paper |
Optimal schedules for single facility with two job classes | 1984-01-01 | Paper |
Technical Note—Improved Dominance Conditions for the Three-Machine Flowshop Scheduling Problem | 1978-01-01 | Paper |
https://portal.mardi4nfdi.de/entity/Q4091699 | 1976-01-01 | Paper |
Optimal flowshop schedules with no intermediate storage space | 1976-01-01 | Paper |
https://portal.mardi4nfdi.de/entity/Q4099409 | 1976-01-01 | Paper |
Analysis of a Combinatorial Approach to Flowshop Scheduling Problems | 1975-01-01 | Paper |
Optimal schedules for special structure flowshops | 1975-01-01 | Paper |
https://portal.mardi4nfdi.de/entity/Q4133367 | 1975-01-01 | Paper |
https://portal.mardi4nfdi.de/entity/Q5684823 | 1973-01-01 | Paper |
A Functional Heuristic Algorithm for the Flowshop Scheduling Problem | 1971-01-01 | Paper |
Technical Note—An Improved Combinatorial Algorithm for the Flowshop-Scheduling Problem | 1971-01-01 | Paper |
https://portal.mardi4nfdi.de/entity/Q5650198 | 1971-01-01 | Paper |
https://portal.mardi4nfdi.de/entity/Q4772962 | 1969-01-01 | Paper |