Jatinder N. D. Gupta

From MaRDI portal
Person:195300

Available identifiers

zbMath Open gupta.jatinder-n-dMaRDI QIDQ195300

List of research outcomes

PublicationDate of PublicationType
Incorporating preventive maintenance into the m-machine no-wait flow-shop scheduling problem with total flow-time minimization: a computational study2022-12-23Paper
Single machine scheduling problem with batch setups involving positional deterioration effects and multiple rate-modifying activities2022-12-23Paper
Supply Chain Coordination with a Risk-Averse Retailer and a Combined Buy-Back and Revenue Sharing Contract2019-10-30Paper
Minimizing the makespan on two identical parallel machines with mold constraints2019-02-19Paper
An improved L-shaped method for solving process flexibility design problems2018-10-12Paper
A comprehensive review of flowshop group scheduling literature2018-07-12Paper
Family scheduling with batch availability in flow shops to minimize makespan2018-04-13Paper
Two-machine flowshop scheduling with three-operation jobs subject to a fixed job sequence2017-09-01Paper
A hybrid Lagrangian-simulated annealing-based heuristic for the parallel-machine capacitated lot-sizing and scheduling problem with sequence-dependent setup times2016-11-17Paper
A heuristic for maximizing investigation effectiveness of digital forensic cases involving multiple investigators2016-11-17Paper
Scheduling identical parallel machines with fixed delivery dates to minimize total tardiness2016-10-06Paper
Scheduling Identical Parallel Machines with a Fixed Number of Delivery Dates2016-05-19Paper
A second order cone programming approach for semi-supervised learning2015-12-08Paper
The ordinal consistency of an incomplete reciprocal preference relation2015-06-23Paper
Flow shop batching and scheduling with sequence-dependent setup times2015-01-22Paper
A three-phase algorithm for flowshop scheduling with blocking to minimize makespan2012-11-15Paper
Using simulated annealing to schedule a flowshop manufacturing cell with sequence-dependent family setup times2010-11-07Paper
Permutation and non-permutation schedules for the flowline manufacturing cell with sequence dependent family setups2010-10-25Paper
Single machine scheduling with sequence-dependent family setups to minimize maximum lateness2010-09-02Paper
Minimizing flowtime subject to optimal makespan on two identical parallel machines2010-03-06Paper
Makespan distribution of permutation flowshop schedules2009-08-28Paper
Supply chain scheduling: Just-in-time environment2008-09-03Paper
Single machine group scheduling with family setups to minimize total tardiness2008-05-06Paper
Single machine scheduling with family setups to minimize total earliness and tardiness2008-01-21Paper
https://portal.mardi4nfdi.de/entity/Q34366022007-05-11Paper
Effect of technological breakthroughs on electronic markets2007-01-24Paper
A penalty-based heuristic algorithm for the permutation flowshop scheduling problem with sequence-dependent set-up times2006-07-06Paper
Minimizing flow time in a flow-line manufacturing cell with family setup times2006-04-11Paper
Flowshop scheduling research after five decades2005-11-04Paper
A review of TSP based approaches for flowshop scheduling2005-11-04Paper
Performance guarantees for flowshop heuristics to minimize makespan2005-11-04Paper
Generating efficient schedules for identical parallel machines involving flow-time and tardy jobs2005-09-28Paper
A review and classification of heuristics for permutation flow-shop scheduling with makespan objective2005-05-23Paper
Maintenance policies for a production system with constrained production rate and buffer capacity2005-04-26Paper
Comparative evaluation of MILP flowshop models2005-04-26Paper
Insights into two solution procedures for the single machine tardiness problem2005-03-14Paper
Scheduling tasks on a flexible manufacturing machine to minimize tool change delays2005-03-08Paper
Minimising makespan in the two-machine flow-shop with release times2005-01-19Paper
Two-machine flow shop scheduling with nonregular criteria2005-01-17Paper
Operational and financial effectiveness of e-collaboration tools in supply chain integration2004-08-16Paper
Scheduling three-operation jobs in a two-machine flow shop to minimize makespan2004-08-10Paper
Two-machine open shop scheduling with secondary criteria2004-08-10Paper
Two-machine flowshop scheduling with a secondary criterion2003-05-14Paper
Minimizing makespan subject to minimum flowtime on two identical parallel machines2002-08-26Paper
Heuristics for hybrid flow shops with controllable processing times and assignable due dates2002-07-11Paper
https://portal.mardi4nfdi.de/entity/Q27819642002-07-02Paper
Local search heuristics for two-stage flow shop problems with secondary criterion2002-02-13Paper
Two-Machine No-Wait Flow Shop Scheduling with Missing Operations2001-11-26Paper
Comparative evaluation of genetic algorithm and backpropagation for training neural networks2001-10-14Paper
https://portal.mardi4nfdi.de/entity/Q27123662001-07-02Paper
Neural networks in business: Techniques and applications for the operations researcher2001-06-10Paper
Scheduling a flowline manufacturing cell with sequence dependent family setup times2000-11-23Paper
Minimizing tardy jobs in a two-stage hybrid flowshop2000-10-09Paper
Minimizing makespan subject to minimum total flow-time on identical parallel machines2000-09-14Paper
Minimizing tardy jobs in a flowshop with common due date2000-03-19Paper
Single-machine scheduling to minimize maximum tardiness with minimum number of tardy jobs2000-01-11Paper
Selecting Scheduling Heuristics Using Neural Networks2000-01-01Paper
A flowshop scheduling problem with two operations per job1999-06-17Paper
A framework for decision support systems of scheduling problems1999-02-28Paper
Genetic algorithms for the two-stage bicriteria flowshop problem1999-02-22Paper
Two-stage no-wait scheduling models with setup and removal times separated1998-06-22Paper
Single machine hierarchical scheduling with customer orders and multiple job classes1998-01-28Paper
Two-machine flowshop scheduling to minimize the number of tardy jobs1997-11-25Paper
Batch scheduling to minimize maximum lateness1997-11-19Paper
Scheduling a two-stage hybrid flow shop with parallel machines at the first stage1997-06-16Paper
Comparative evaluation of heuristic algorithms for the single machine scheduling problem with two operations per job and time-lags1997-01-07Paper
A Savings Index Heuristic Algorithm for Flowshop Scheduling with Sequence Dependent Set-up Times1996-10-22Paper
Flowshop scheduling with dominant machines1995-11-23Paper
Lot streaming in three-stage production processes1995-11-09Paper
Scheduling a two-stage hybrid flowshop with separable setup and removal times1994-09-15Paper
The two-machine flowshop scheduling problem with total tardiness1989-01-01Paper
Single facility scheduling with multiple job classes1988-01-01Paper
Two-Stage, Hybrid Flowshop Scheduling Problem1988-01-01Paper
Generating improved dominance conditions for the flowshop problem1987-01-01Paper
https://portal.mardi4nfdi.de/entity/Q38069681987-01-01Paper
The two-machine sequence dependent flowshop scheduling problem1986-01-01Paper
Polynomial approximation technique for dynamic optimization problems1986-01-01Paper
FLOWSHOP SCHEDULES WITH SEQUENCE DEPENDENT SETUP TIMES1986-01-01Paper
Optimal schedules for single facility with two job classes1984-01-01Paper
Technical Note—Improved Dominance Conditions for the Three-Machine Flowshop Scheduling Problem1978-01-01Paper
https://portal.mardi4nfdi.de/entity/Q40916991976-01-01Paper
Optimal flowshop schedules with no intermediate storage space1976-01-01Paper
https://portal.mardi4nfdi.de/entity/Q40994091976-01-01Paper
Analysis of a Combinatorial Approach to Flowshop Scheduling Problems1975-01-01Paper
Optimal schedules for special structure flowshops1975-01-01Paper
https://portal.mardi4nfdi.de/entity/Q41333671975-01-01Paper
https://portal.mardi4nfdi.de/entity/Q56848231973-01-01Paper
A Functional Heuristic Algorithm for the Flowshop Scheduling Problem1971-01-01Paper
Technical Note—An Improved Combinatorial Algorithm for the Flowshop-Scheduling Problem1971-01-01Paper
https://portal.mardi4nfdi.de/entity/Q56501981971-01-01Paper
https://portal.mardi4nfdi.de/entity/Q47729621969-01-01Paper

Research outcomes over time


Doctoral students

No records found.


Known relations from the MaRDI Knowledge Graph

PropertyValue
MaRDI profile typeMaRDI person profile
instance ofhuman


This page was built for person: Jatinder N. D. Gupta