A flowshop scheduling problem with two operations per job
From MaRDI portal
Publication:4252108
DOI10.1080/002075497194868zbMath0945.90594OpenAlexW1986364573MaRDI QIDQ4252108
Publication date: 17 June 1999
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/002075497194868
Related Items
Scheduling flexible flow lines with sequence-dependent setup times ⋮ An immune algorithm approach to hybrid flow shops scheduling with sequence-dependent setup times ⋮ Minimizing makespan in two-stage hybrid cross docking scheduling problem ⋮ Sequencing a hybrid two-stage flowshop with dedicated machines ⋮ A bottleneck-based heuristic for minimizing makespan in a flexible flow line with unrelated parallel machines ⋮ Heuristics for the two-stage job shop scheduling problem with a bottleneck machine