Using simulated annealing to schedule a flowshop manufacturing cell with sequence-dependent family setup times
From MaRDI portal
(Redirected from Publication:3055422)
Recommendations
- scientific article; zbMATH DE number 4149877
- Metaheuristics for scheduling a non-permutation flowline manufacturing cell with sequence dependent family setup times
- Simulated annealing heuristic for flow shop scheduling problems with unrelated parallel machines
- Minimizing makespan for flow shop scheduling by combining simulated annealing with sequencing knowledge
- Scheduling a flowline manufacturing cell with sequence dependent family setup times
Cites work
- A comparison of exhaustive and non-exhaustive group scheduling heuristics in a manufacturing cell
- A survey of scheduling problems with setup times or costs
- An evaluation of group scheduling heuristics in a flow-line manufacturing cell
- Flowshop scheduling research after five decades
- Heuristics and sequence-dependent set-up jobs in flow line cells
- Optimization by simulated annealing
- Scheduling a flowline manufacturing cell with sequence dependent family setup times
- The two-machine sequence dependent flowshop scheduling problem
Cited in
(13)- Flow shop batching and scheduling with sequence-dependent setup times
- scientific article; zbMATH DE number 4149877 (Why is no real title available?)
- A simulation-optimization model for solving flexible flow shop scheduling problems with rework and transportation
- Family scheduling with batch availability in flow shops to minimize makespan
- The third comprehensive survey on scheduling problems with setup times/costs
- A comprehensive review of flowshop group scheduling literature
- Optimizing of bullwhip effect and net stock amplification in three-echelon supply chains using evolutionary multi-objective metaheuristics
- A branch and bound enhanced genetic algorithm for scheduling a flowline manufacturing cell with sequence dependent family setup times
- Effect of solution representations on tabu search in scheduling applications
- Applying simulated annealing to a generalized cell formation problem considering alternative routings and machine reliability
- Metaheuristics for scheduling a non-permutation flowline manufacturing cell with sequence dependent family setup times
- Scheduling a flowline manufacturing cell with sequence dependent family setup times
- Minimizing flow time in a flow-line manufacturing cell with family setup times
This page was built for publication: Using simulated annealing to schedule a flowshop manufacturing cell with sequence-dependent family setup times
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3055422)